Tenant Improvement & Build-Outs in Fort Worth, TX
We take commercial spaces from white box to move-in across Dallas–Fort Worth, coordinating with the landlord and the building's rules from the first walk through final inspection.
Se habla español
Permits and registration in Fort Worth
Permit department
City of Fort Worth Development Services Department — official page
Fort Worth is in Tarrant County.
Online permit portal
Accela Citizen Access — portal page
Contractor registration
Fort Worth requires any firm or individual pulling a building, mechanical, plumbing or electrical permit to have a valid contractor registration on file, with limited owner-occupant exceptions. source
Re-roof permit
In Fort Worth a re-roof permit depends on scope: decking, sheathing, rafter or pitch changes trigger a permit, while a shingles-only tear-off does not, subject to code limits on layering. source
Adopted building code
Fort Worth adopted the 2021 International Building, Mechanical, Plumbing, Fuel Gas, Fire and Existing Building Codes effective April 1, 2022, with the 2023 National Electrical Code effective March 1, 2024. source
Districts and areas we work in
Downtown / Sundance Square · Stockyards National Historic District · Cultural District · Near Southside · Panther Island
What we see in Fort Worth buildings
- The city's Permit Assist tool is integrated with Accela under a single login, so applications and issuance run through one workflow. source
- Fort Worth publishes a residential remodel checklist and packet spelling out the floor plans and MEP plans required at submittal. source
- The Stockyards has its own historic and form-based code district covering the historic livestock-market area, which shapes what exterior work is allowed. source
- Panther Island is a 300-plus-acre Trinity River waterfront redevelopment north of downtown tied to a new flood-control bypass channel. source
- The Tarrant Regional Water District issued a developer RFQ in November 2025 for the first phase of the Panther Island district. source
Storm history to plan around
- April 24–29, 2026: NWS Fort Worth logged a severe storm and tornado outbreak across North Texas, including an EF-3 tornado at Mineral Wells. source
- Jan. 23–26, 2026: NWS Fort Worth logged a winter storm event across the North Texas forecast area. source
- February 2021: Winter Storm Uri knocked multiple Fort Worth water treatment plants offline during the statewide power crisis, and the city later published what it learned from the response. source
What this includes
White box to move-in
Demolition, layout, finishes, doors and hardware, flooring and final clean — ready for your furniture delivery date.
Partitions and ceilings
Metal framing, drywall, acoustical grid and tile, soffits and specialty ceilings built to the finish schedule.
MEP rough-in and trim
Electrical, plumbing and mechanical rough-in coordinated above ceiling, then trimmed out and tested.
Landlord coordination
We work through building standards, insurance certificates, loading dock and elevator scheduling, and after-hours access.
We pull permits
Plan submittal, permit and inspections are handled on our side and tracked to close out.
Fort Worth questions, answered
Do I need a permit for tenant improvement & build-outs in Fort Worth?
Yes — permitted work in Fort Worth goes through City of Fort Worth Development Services Department. Permits are filed through Accela Citizen Access, the city's online permit portal. Fort Worth requires any firm or individual pulling a building, mechanical, plumbing or electrical permit to have a valid contractor registration on file, with limited owner-occupant exceptions. We pull the permits for the scope and coordinate inspections. In Fort Worth a re-roof permit depends on scope: decking, sheathing, rafter or pitch changes trigger a permit, while a shingles-only tear-off does not, subject to code limits on layering. source
How soon can you walk the space?
We schedule an inspection within 24 to 48 hours of your request in most of Dallas–Fort Worth.
Do you work with our architect's drawings?
Yes. We bid and build from your permit set and flag conflicts before they reach the field.
Can you work after hours in an occupied building?
Yes. Night and weekend work is common for build-outs in occupied buildings and is priced into the bid.
Who handles the permit?
We do. We submit, pull the permit and coordinate inspections with the city.
Tenant Improvement & Build-Outs in Fort Worth? Let's walk it.
Inspection in 24–48 hours, itemized bid after the walk, and a private client portal for the project.

